NAME:
UGA – Sanford Stadium – West End Improvements
LOCATION:
Athens, GA
PROJECT SIZE:
5,700 LF of Underground Piping
CONTRACT TYPE:
Negotiated with Design-Assist Services
SCOPE OF WORK:
Design-Assist, Mechanical, Insulation
Batchelor & Kimball installed a pre-fabricated/pre-insulated Theramacor piping system. This system will provide steam, condensate, and chilled water to the new Sanford Stadium West End Zone locker rooms, restrooms, concessions, and recruiting space. The whole system was installed under a very tight schedule and in a high traffic area on a college campus. All work had to be completed within 12 weeks (Hydrovac, excavation, piping, testing, backfill), while ensuring that access to roads, driveways, and parking decks was always maintained. This project included work inside of mechanical vaults, chilled water hot taps, and tie-ins inside an existing steam vault.