PROJECT DETAILS

NAME:
UGA – Sanford Stadium – West End Improvements

LOCATION:
Athens, GA

PROJECT SIZE:  
5,700 LF of Underground Piping

CONTRACT TYPE:
Negotiated with Design-Assist Services

SCOPE OF WORK:
Design-Assist, Mechanical, Insulation

PROJECT SUMMARY:

Batchelor & Kimball installed a pre-fabricated/pre-insulated Theramacor piping system.  This system will provide steam, condensate, and chilled water to the new Sanford Stadium West End Zone locker rooms, restrooms, concessions, and recruiting space.  The whole system was installed under a very tight schedule and in a high traffic area on a college campus.  All work had to be completed within 12 weeks (Hydrovac, excavation, piping, testing, backfill), while ensuring that access to roads, driveways, and parking decks was always maintained.  This project included work inside of mechanical vaults, chilled water hot taps, and tie-ins inside an existing steam vault.