PROJECT DETAILS

NAME:
Noramco

LOCATION:
Athens, GA

PROJECT SIZE:  
6,500 ft2 Renovated / 2,400 ft2 New Addition

CONTRACT TYPE:
Negotiated with Design Assist Services Schematic through construction offering value analysis, alternate pricing, constructability reviews, and equipment recommendations

SCOPE OF WORK:
Pre-Construction, Design-Assist, BIM, HVAC, Plumbing, High Purity Piping, Equipment Connections, Sheet Metal, Insulation, Passivation, Commissioning Assistance, Test & Balance

BIM:
Full 3D Model Produced

PROJECT SUMMARY:

Project Kickstart was a renovation and expansion of the current Noramco manufacturing facility.  The pipe was installed off isometric drawings that were produced by the engineer.  This project consisted of the following piping: 1,100 LF- High Purity Stainless Steel Piping, 4,700 LF- 316 Stainless Steel Piping, and 2,900 LF- Carbon Steel Piping.  Since this project was a renovation and expansion, many times we were working near and around live systems. Most of the work was in tight spaces which required detailed coordination between all trades.  The BIM Model allowed each trade to coordinate potential conflicts before the workers were present in that area.